What Happens When the Deadline Arrives?
Operational software rarely has unlimited time. A dispatch decision, policy check, or schedule change usually has a response budget measured in seconds or minutes.
Navokoj is an anytime runtime. It keeps the best-known assignment during execution and returns it when the budget expires.
The response has meaning#
Applications should distinguish:
solved: every constraint satisfied;feasible: every hard constraint satisfied, even if soft preferences remain;partial: a best-known assignment with residual violations;timeout: the budget ended before a complete result;error: the request could not be processed.
This is different from returning an empty failure. A partial result is not silently presented as a valid plan; it carries its remaining conflicts so the caller can decide whether to retry, escalate, or ask for human review.
Why this matters#
The deadline is part of the product contract. Customers can choose a fast response for interactive workflows, a longer budget for planning, or a dedicated deployment for workloads that need more capacity. The same model can therefore serve a dashboard and a batch planning job without pretending they have the same operating requirements.
The result also records runtime and billing information so the decision can be reconciled after execution.
A request and its result#
{
"num_vars": 224,
"clauses": [[22, 43, 64], [-1, -22, -43]],
"weights": [1000, 5],
"hard_clause_mask": [true, false],
"engine": "nitro",
"timeout_budget_seconds": 0.5
}
The real model would contain the complete clause set; this abbreviated request highlights the fields that govern result interpretation. The corresponding response vocabulary can look like:
{
"success": true,
"solution": {
"status": "FEASIBLE",
"solved": false,
"feasible": true,
"hard_satisfied": 1757,
"hard_constraints": 1757,
"soft_unsatisfied": 31,
"solve_time_seconds": 0.001789
},
"engine_used": "nitro",
"engine_trace": [
{
"engine": "sutra",
"budget_mode": "engine-bounded",
"runtime_ms": 1.789
}
]
}
solved: false does not mean the result is unusable. Here it means not every soft preference was satisfied. feasible: true says every explicitly hard rule holds, which is the property an application normally requires before executing the schedule.
Status and quality are different axes#
| Field | Question |
|---|---|
success | Did the API process the request? |
status | How did the selected engine classify the outcome? |
solved | Were all submitted constraints satisfied? |
feasible | Were all explicit hard constraints satisfied? |
| Satisfaction / soft cost | How good is the candidate beyond feasibility? |
| Engine trace | Which controls and execution path produced it? |
An HTTP 200 response can contain a partial assignment. A timeout can contain a hard-feasible assignment. A fast engine completion can still leave soft cost. These fields should not be collapsed into one application Boolean.
Engine-specific budget behavior#
timeout_budget_seconds is the caller’s requested decision budget. The runtime translates it into the controls supported by the selected engine.
Those controls are not identical:
- some paths support a wall-clock deadline directly;
- some use iteration, node, or repair limits derived from the requested budget;
- an engine may converge or exhaust its configured work before the requested time;
- requesting ten seconds does not require an engine to remain busy for ten seconds;
- a longer request budget does not guarantee a better assignment.
The current SUTRA alpha path translates the request into engine-supported bounded-work controls rather than a native wall-clock deadline. For that path, the engine trace is essential: it identifies the budget mode and measured runtime used to interpret the request. Exact internal tuning parameters are intentionally not part of the public API contract.
The honest contract is therefore:
The caller supplies an end-to-end decision budget; the response reports the engine-specific work and result actually produced within the runtime’s supported controls.
What the application should do#
| Result | Safe default |
|---|---|
solved=true | Execute after domain checks |
feasible=true, solved=false | Execute if soft compromises are acceptable |
partial, hard violations remain | Do not execute as a valid plan; retry, revise, or escalate |
timeout, feasible assignment present | Treat according to feasibility and quality policy |
error | Fail closed and preserve the request identifier |
For a scheduling workflow, a useful policy might be:
if result["feasible"]:
publish_for_review(result["assignment"], result["violations_summary"])
elif can_retry_with_more_capacity(result):
enqueue_planning_retry()
else:
escalate_to_scheduler(result["violations_summary"])
What not to infer#
A deadline-bounded result does not automatically establish:
- global MaxSAT optimality;
- general UNSAT proof;
- uniqueness of the assignment;
- monotonic improvement for every larger budget;
- permission to execute a partial plan.
It establishes exactly what the response and verifier show: the status of the returned assignment under the submitted model and the execution controls recorded for that run.